Roads, Bridges, etc.
 |
|
San Francisco-Oakland Self-anchored Suspension Bridge, Construction scheduling and Claims Analysis, Oakland, California, present
Providing claims analysis services for this multi-billion dollar, high profile Caltrans SAS project. |
|
San Francisco-Oakland Self-anchored Suspension Bridge Superstructure Project, San Francisco-Oakland, California, present
Providing scheduling support services for this multi-billion dollar high-profile, Bay Area Caltrans bridge project. |
|
 |
| |
Toll Bridge Seismic Retrofit Project, Benicia/Martinez Bridge, Martinez, California, 2003-2006
- Marina Vista Interchange: Provided scheduling support services on this $45M bridge and highway interchange
- Toll Plaza and Operations Building: Provided scheduling support services for this $24M, 17-gate toll plaza project.
- Wetlands Mitigation Project: Provided scheduling support services on this $6.3M project which consisted of the creation of approximately 8 acres of tidal bird wildlife habitat area reduction caused by construction of the new Benicia/Martinez Bridge.
- Bridge Fender Replacement: Provided scheduling support services for this $3.1M project which consisted of the replacement of existing, wood-treated timber assemblies with new plastic wood fenders at the16 piers at the waterline of the existing bridge.
Toll Bridge Seismic Retrofit Program, San Mateo/Hayward Bridge, 2000-2004
Provided cost estimating and claims analysis evaluation on pending contract change orders as well as preparation of claims files, documents and reports to assist the Resident Engineer in managing current claims.
Utilities-wastewater treatment
Coastal Water Project, Moss Landing, CA
Performed a conceptual estimate in July 2004 for an 18 million gallon/day reverse osmosis treatment facility in Moss Landing, California. This project also included 175,000 linear feet of large diameter transmission pipelines for treated water distribution, an ASR (aquifer storage and recovery) facility, inline booster pump stations and remote storage facilities, large O&M and chemical storage buildings and a rail spur.
Furnace Creek Water System, Death Valley, CA
Provided cost estimating services for the restoration of the California State Parks Water System, consisting of new and refurbished waterlines, new wells, new storage facilities, new and refurbished treatment systems, collection galleries.
Deer Creek Wastewater Treatment Plant Upgrade, Placerville, CA
The project consisted of a 1 million gallon storage tank rehabilitation, a new 2 million gallon storage tank, new tank aeration systems, new aeration basin, secondary effluent structure, new UV disinfection systems, yard piping, site work and electrical instrumentation. |